Summary goes here
Kaydedildi:
| Materyal Türü: | Kitap |
|---|---|
| Dil: | İngilizce |
| Konular: | |
| Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
| era | |
|---|---|
| format | Book |
| genre | |
| geographic | |
| id | c56586b5-be4d-49c3-a63f-e4f0a3c15bb5 |
| isbn | |
| issn | |
| language | eng |
| physical | 1 volume |
| publication | – publisher: National Aeronautics and Space Administration dateOfPublication: 1996 |
| publishDate | 1996 |
| subjects | |
| title | Investigations into generalization of constraint-based scheduling theories with applications to space telescope observation scheduling : final report for NASA contract # NCC 2-531 / prepared by Nicola Muscettola and Steven S. Smith. |
| topic | Hubble Space Telescope (Spacecraft) Hubble Space Telescope (Spacecraft) Heuristic. Problem solving. Scheduling. Artificial intelligence. Heuristique. Résolution de problème. Emploi du temps. Intelligence artificielle. artificial intelligence. Artificial intelligence Heuristic Problem solving Scheduling Hubble Space Telescope. Heuristic methods. Problem solving. Scheduling. Artificial intelligence. |